Customization: | Available |
---|---|
Application: | Computer, Electronic, Automobile, RF, Home Appliance, Motorcycle |
Wire Core Material: | Copper Wire |
Still deciding? Get samples of US$ 1.2/Piece
Order Sample
|
Shipping Cost: | Contact the supplier about freight and estimated delivery time. |
---|
Payment Methods: |
|
---|---|
Support payments in USD |
Secure payments: | Every payment you make at Made-in-china.com is protected by the platform. |
---|
Refund policy: | Claim a refund if your order doesn't ship, is missing, or arrives with product issues. |
---|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Product Name | Wiring Harness |
R&D Ability | Customized wiring according to your samples or drawings. |
Cable Materials | Wire harness can be UL/CSA,CE, VDE,SAA,CB etc |
Cable Certificate | UL, CSA, VDE, CE, RoHS, ISO9001 |
Connector Type Range | Deutch, JAE, Hirose, Molex, AMP, etc, base on customer's request |
Application | Industrial, Automation, Medical, Automotive, Consumer Electronics etc. |
Cable Preparation | Trimmings, Stripping, Tin coating, Twisting |
Cable Color & Length | According to the customers' requirements |
Application | Automotive,Electrical, Industry, Medical |
Service | OEM and ODM products are acceptable |
Design Ability | We can supply samples, OEM & ODM are welcome. |
MOQ | Small MOQ and trial order are welcome. |
Samples | Samples confirmed first before mass production |
Engineering service | Development and early Design in support, analysis 2D or 3D drawings |
Final assembly | Bolting,Binding,Shrinking,Extruding,Strain Relief Molding,Inner and Outer Molding |
Quality Control | 100% electrical and electricity performance test,100% inspected before dispatching. |
Packaging | Inner PE bags with label, outside carton |
Delivery Time | 10- 45 days, on-time delivery |
Payment | T/T, Paypal, Western Union, L/C |
1.Competitive product quality--from material incoming to final product delivery,adozen inspection items was operated with various high level inspection equipments. |
2.Completely certifications-we certified by ISO9001,UL and ROHS for several years. |
3.Flexible and quick lead time: With great material stock management and high production efficiency in full-automatic production line, we can guarantee general lead time of 15 days. |
4.Competitive cost efficiency: Competitive material resource and lean production management to support our great cost efficiency. |
5.Competitive R&D capability: With experienced design engineers resource and great production capability, we successfully developed more than hundreds products. |
6.Abundant product models: we have dozens product series with more than thousands product models. 7. Be willing to keep stock of finish product or material for customers to shorten the lead time |